Laserfiche WebLink
i <br /> IV. Findings <br /> 1. The Property is located in the I-1 and C-2 Zones as depicted on the Town of Mashpee zoning <br /> Map, with the proposed development located entirely within the I-1 Zone except for an <br /> alternate access driveway extending across the C-2 zone to Route 130. <br /> 2. The project satisfies the requirements of Massachusetts General Law Chapter 40A, in that it <br /> complies with the general purposes and intent of the Mashpee ZoningBy-Law. <br /> 3. The proposed development complies with the lot area and dimensional requirements set forth <br /> in the Zoning By-Law. <br /> 4. No water quality report was provided, as there were no structures or parking proposed. <br /> 5. The applicant submitted a letter dated February 20, 2002 detailing the types and quantities of <br /> materials to be stored on the property. No vehicles or equipment are to be stored on the site. <br /> 6. In conformance with the provisions of Article VI, Section 174-24.C.(2) of the Zoning Bylaw, the <br /> Planning Board finds that the proposal will not adversely affect public health or safety, will not <br /> cause excessive demand on community facilities, will not significantly decrease surface or <br /> ground water quality or air quality, will not have significant adverse impact on wildlife habitat, <br /> estuarine systems, traffic flow, traffic safety, waterways, fisheries, public lands or neighboring <br /> properties, will not cause excessive levels of noise, vibration, electrical disturbance, radioactivity <br /> or glare, will not destroy or disrupt any species listed as rare, endangered or threatened by the <br /> Massachusetts Natural Heritage program or any known historic or archaeologic site, will not <br /> produce amounts of trash, refuse or debris in excess of the town's landfill and waste disposal <br /> capacities, will properly dispose of stumps, construction debris, hazardous materials and other <br /> wastes, will provide adequate off street parking, will not cause excessive erosion or cause <br /> increase runoff into neighboring properties or into any natural river, stream, pond or water <br /> body and will not otherwise be detrimental to the town or the area. <br /> V. Conditions. <br /> 1. Construction of this Project shall be done only in conformance with the following plans, which <br /> have been approved by the board and signed by the Board Chairman: <br /> "Proposed Storage Area Located in Mashpee, Mass. Prepared for Steve Giatrelis"prepared by <br /> Cape & Islands Engineering, 800 Falmouth Road — Suite 301C, Mashpee, MA 02649, scale <br /> 1"=100', dated November 19, 2001. <br /> "Proposed Storage Area Located in Mashpee, Mass. Prepared for Steve Giatrelis"prepared by <br /> Cape & Islands Engineering, 800 Falmouth Road — Suite 301C, Mashpee, MA 02649, scale <br /> 1"=40', dated November 19, 2001, showing only the portion of the site to be utilized for <br /> storage. <br /> 2. The proposed storage area shall not exceed 0.99 acres in area and except for one driveway <br /> access, The existing native vegetation shall be retained, including understory vegetation, in all <br /> other areas of the property. <br /> -2- <br />