Laserfiche WebLink
proposed stormwater infiltration systems. <br /> 8. Per the provisions of Section 174-47, the Applicant has chosen to deed the open space <br /> parcels to the Town of Mashpee. <br /> 9. The project has been approved as a Development of Regional Impact by the Cape Cod <br /> Commission, whose decision is dated September 21, 2000 and is attached, by reference, to <br /> this decision. <br /> 10. The project has been granted a variance by the Mashpee Zoning Board of Appeals from the <br /> requirements of Sections 174.26.A and 174-26.B.1 regarding project phasing and issuance <br /> of building permits. The decision of the ZBA is attached hereto by reference. <br /> 11. In conformance with the provisions of Article VI, Section 174-47.B, the Planning Board <br /> finds that the public good will be served, that the proposed plan will be superior to a <br /> conventional plan in preserving natural open space, utilizing natural features of the land <br /> and allowing more efficient provisions for public services and that the other criteria of <br /> Section 174-47.B. have been met. <br /> 12. In conformance with the provisions of Article VI, Section 174-24.C.(2) of the Zoning Bylaw, <br /> the Planning Board finds that the proposal will not adversely affect public health or safety, <br /> will not cause excessive demand on community facilities, will not significantly decrease <br /> surface or ground water quality or air quality, will not have significant adverse impact on <br /> wildlife habitat, estuarine systems, traffic flow, traffic safety, waterways, fisheries, public <br /> lands or neighboring properties, will not cause excessive levels of noise, vibration, electrical <br /> disturbance, radioactivity or glare, will not destroy or disrupt any species listed as rare, <br /> endangered or threatened by the Massachusetts Natural Heritage program or any known <br /> historic or archaeologic site, will not produce amounts of trash, refuse or debris in excess'of <br /> the town's landfill and waste disposal capacities, will properly dispose of stumps, <br /> construction debris, hazardous materials and other wastes, will provide adequate off street <br /> parking, will not cause excessive erosion or cause increase runoff into neighboring <br /> properties or into any natural river, stream, pond or water body and will not otherwise be <br /> detrimental to the town or the area. <br /> V. Conditions. <br /> 1. Construction of this Project shall be done only in conformance with the following plans <br /> which have been approved by the board: <br /> "Subdivision Plan of Land Prepared for CSC Group Located in Mashpee, Mass." cover <br /> sheet dated February 6, 2001, by Christopher Costa & Assoc.; P.O. Box 128 / 465 Main <br /> Street, East Falmouth, Mass., sheets 1-9. Sheet 2 bears a revision date of March 8, <br /> 2001. Sheets 3 and 9 are dated January 15, 2001. Sheets 4, 5, 6 and 7 bear a revision <br /> date of March 28, 2001 and are subject to further revision regarding soil materials in <br /> drainage swales (see condition #9). Sheet 8 bears a revision date of March 6, 2001. <br /> -3- <br />