My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/2024 COMMUNITY PRESERVATION ACT COMMITTEE Minutes (2)
>
12/19/2024 COMMUNITY PRESERVATION ACT COMMITTEE Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2025 5:24:56 PM
Creation date
1/31/2025 11:35:45 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
COMMUNITY PRESERVATION ACT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/19/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7 <br /> Community Preservation Committee <br /> Minutes <br /> December 19, 2024 <br /> Virginia White—LeClair Village, ground- <br /> Ot _LeClair ____t_L - la�,' <br /> The Community Preservation Committee met with Virginia White, Senior Development <br /> Associate of POAH,Inc. owner and developer of the LeClair Village Affordable Housing <br /> property to review the proposed LeClair Village Playground project. CPA funding in the amount <br /> of$309,000 is requested for this purpose. <br /> Ms. White indicated the playground was removed from the project scope due to cost restrictions <br /> and the COVID virus. The project serves affordable housing needs with 39 units consisting of <br /> low to moderate income housing,with 70%local preference for Mashpee residents. <br /> With the completion of the building, it is desirable to provide enrichment and duality outdoor <br /> space. The closest playground in this area is at the K.C. Coombs School which is difficult to <br /> access due to the lack of sidewalks. When school is in session,there is no allowable access to <br /> the school playgrounds. <br /> A sound play.structure is planned with a climbing net on a clear flat surface that is handicap <br /> accessible. The intended age group is 3-13 years. Benches would also be situated in the area for <br /> additional age groups. There is paved parking on site for public access as CPC funds require <br /> accessibility to the public. <br /> It was noted the Town of Mashpee has donated land, and through its CPC and Affordable <br /> Housing Trust has given generous support to this affordable housing project. In 2022,the CPC <br /> was noted to have withdrawn the suggestion for a playground due to funding constraints. It was <br /> requested that contributions be sought from outside agencies. <br /> Ms. White indicated the proposal considers hard costs as well as contingencies. Alternative <br /> funding sources would be sought to bring this project to fruition as it was initially envisioned. <br /> The Town remitted a grant application for Community Development Block Grant funds for the <br /> playground,but unfortunately the monies were not secured for this project. <br /> Projects receiving a contribution from the Community Preservation Committee require a plaque <br /> for CPC recognition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.