My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/02/1985 Annual Town Meeting
>
12/02/1985 Annual Town Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 1:58:37 PM
Creation date
3/10/2025 4:21:07 PM
Metadata
Fields
Template:
Town Meeting Warrants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
submitted to the Planning Board in <br /> conformance with the phasing schedule of the <br /> special permit and with the normal <br /> subdivision regulations of the Town , except <br /> that the definitive plan for the required <br /> open space area noted by Subsection 9.333 <br /> shall not require a preliminary plan and <br /> shall be filed with the Board no later than <br /> thirty (30) days from the date of <br /> approval of the OSID special permit . <br /> 9.376 Construction and Development Within the OSID <br /> - The construction of buildings within the <br /> OSID as well as the construction of golf <br /> courses and any other facility or <br /> structure requiring significant disturbance <br /> of natural topography or vegetation , other <br /> than detached single-family residences shall <br /> require a special permit from the Planning <br /> Board in conformance with the <br /> recommendations of the Design Review <br /> Committee . Application , review and <br /> approval procedures shall be as follows: <br /> (a) Application shall be made to the <br /> Design Review Committee , said <br /> application to include , <br /> along with any required. forms <br /> and fees, specific building <br /> locations, generalized <br /> architectural plans, utilities, <br /> vehicular and pedestrian <br /> facilities , parking areas, proposed <br /> drainage facilities, proposed <br /> landscaping and any other materials <br /> required by 6e Committee . <br /> Submission of large segments of the <br /> OSID phases, or an entire phase , is <br /> encouraged. <br /> ib) Within thirty ( 30 ) days of the <br /> receipt of the application , the <br /> Committee shall review the <br /> application at a regular or special <br /> meeting with regard to conformance <br /> with the provisions and conditions <br /> of the OSID special permit , <br /> any other app 1 i cab] e Tot-in by-1 aws <br /> and regulations, and the <br /> .attractiveness and appropriateness <br /> cif the design . <br /> c ) 6,1 i th i n for t y-f i v e ( 45) days of sa i d <br /> meeting, unles_=_. an extension of <br />
The URL can be used to link to this page
Your browser does not support the video tag.