My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/26/2024 CONSERVATION COMMISSION Minutes (2)
>
09/26/2024 CONSERVATION COMMISSION Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:19:21 AM
Creation date
3/13/2025 9:07:12 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and SAS must be maintained, or a variance must be requested. Access to septic <br />components must be maintained. Note the location of the septic system and restrict <br />equipment/ vehicle traffic over non-load bearing (H-10) components. <br /> <br /> BUILDING: Application submitted to ZBA Board of Health <br /> <br />Motion: <br /> Mr. Cook motioned for a continuance to October 24, 2024, at 6:30 pm. Mr. Sahl <br />seconded. No further discussion. <br />Roll Call: <br /> Mr. Cook (Yes), Mr. Sahl (Yes), Ms. Godfrey (Yes), Ms. Thornbrugh (Yes) and Mr. <br />Colombo (Yes) <br />o The motion passed unanimously. <br /> <br />Documents provided: Notice of intent application and project narrative September 9, 2024, Site plan – <br />Proposed addition <br /> <br />6:45 <br />NOI #43-3314 <br /> 291 Monomoscoy Road, Jaques N. Morin, Trustee, The 291 Monomoscoy Realty <br />Trust; Representative: Down Cape Engineering, Inc., Daniel Ojala; Brian Wall, local attorney <br /> <br />*Mr. Sahl recused* <br /> <br />Project Overview: <br /> Proposed construction of a single-family dwelling, hardscaping, landscaping, associated <br />utilities, and an I/A septic system <br /> Lot Details: Grandfathered lot, approximately 5,000 sqft with 50 ft frontage <br /> Located in an area subject to coastal storm flowage <br />Engineering and Environmental Considerations: <br /> Building Plans: Approximately 2,064 sqft (1,160 sqft first floor, 904 sqft second floor) <br />living area <br /> Flood Zone Compliance: House designed to FEMA standards with flood vents to mitigate <br />coastal storm flowage impacts <br /> Waivers Requested: Several waivers were requested due to the lot’s grandfathered status <br />and unique characteristics <br /> Nitrogen Calculations: Demonstrated low impact with a 1,000 sqft lawn <br /> Buffer Zones: Property is buffered by nearby homes and roadways, <br />minimizing impact on wetlands and salt marshes <br />Concerns and Questions from Commissioners: <br /> Footprint Accuracy: <br />12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.