My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/10/2022 CONSERVATION COMMISSION Minutes
>
11/10/2022 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 5:00:22 PM
Creation date
3/19/2025 8:36:13 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/10/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Motion made by Ms. Clapprood for a negative determination with the condition that the <br /> applicant provide the Commission with proof of passing Title V. Motion seconded by Ms. <br /> Copeland. <br /> • The Commission notes the lack of mitigation in the area disturbed by the new <br /> septic system. <br /> • Additional discussion ensued regarding the condition proposed. <br /> • Mr. O'Neil proposes an amended motion for a negative determination with the <br /> recommendation of the Agent for mitigation of the disturbed areas. <br /> • No objection to the amendment. <br /> • Amended motion seconded by Ms. Copeland <br /> • Roll Call: Ms. Clapprood (Yes),Ms. Copeland (Yes), Mr. O'Neil (Yes),Mr. <br /> Dalton(Yes),Mr. Colombo(No). <br /> The motion passes (4:1) <br /> Documents provided: Request for Determination of Applicability 05/26/2022"Site Plan";08/30/2022"Plot <br /> Plan of Proposed Septic System Upgrade 2 sheets" <br /> 6:15 <br /> NOI <br /> 2 Cross Tree Way, Steven &Phyllis Fagell. Proposed raze and replace existing <br /> dwelling and appurtenances. Title 5 septic system, pool,patio,handscaping and landscaping. <br /> Representative: Cape& Islands Engineering, Inc (Raul Lizardi-Rivera) (Continued 10/27) <br /> The proposed project is for a raze and replace of a single family dwelling, including pool, <br /> mitigation plantings, removal of invasive species with management and installation of a new <br /> denitrifying Title V septic system. <br /> Revisions: <br /> 1. Dewatering System: Implemented for the construction process, specifically for installing <br /> the footings. <br /> 2. Groundwater Elevation:2.3. <br /> 3. Poollnformation: <br /> a. Saltwater <br /> b. 6 ft depth <br /> c. Footings may be within the reach of groundwater;thus, a dewatering system is <br /> provided. <br /> 4. Tree Removal: <br /> a. 5 Pitch Pines with severe beetle infestation. <br /> b. 3 additional trees with signs of beetle infestation (less severe). <br /> o Tyler Gaudreau has submitted a letter of explanation,read into the record. <br /> 5. Mitigation ratio: 1:1. <br /> 6. Soil Profile: Added to the plan. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.