My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/14/1998 SELECT BOARD Minutes
>
09/14/1998 SELECT BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 5:04:31 PM
Creation date
4/1/2025 9:06:02 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
09/14/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE ORDER <br /> A!A Document G701 Owner p <br /> Architect p <br /> lContractor p <br /> Field p <br /> Other p <br /> PROJECT: Additions and Renovations CHANGE ORDER NUMBER: 7 <br /> (name,address) Mashpee Town Hail <br /> DATE: June 1, 1998 <br /> TO CONTRACTOR: D'Agostino Associates, Inc. ARCHITECT'S PROJECT NO. 95064 <br /> (name, address) 46 Farwell Street <br /> Newton, MA 02160 CONTRACT DATE: May 10, 1996 <br /> CONTRACT FOR: Construction <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> Item#1 - Modify ground floor from a live storage area $ -10,500 <br /> TOTAL CHANGE ORDER $ -10,500 <br /> Certification of Appropriation under M.G.L.c44,s31 C: Adequate funding in an <br /> amount sufficient to cover the total cost of this change order is available. <br /> By: Date: <br /> Not valid until signed by the Owner,Architect and Contractor. <br /> The original Contract Sum was: $ 1,486,900.00 <br /> Net change by previously authorized Change Orders $ 133,770.00 <br /> The Contract Sum prior to this Change Order was $ 1,620,670.00 <br /> The Contract.sum will be decreased by this Change Order in the amount of X $ -10,500.00 <br /> The new Contract Sum including this Change Order will be $ 1,610,170.00 <br /> The Contract Time will bo unchanged <br /> The date of Substantial Completion as of the date of this Change Order therefore is May 24, 1997 <br /> Note: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been <br /> authorized by Construction Change Directive <br /> Town of Mashpee <br /> Strekalovsky & Hoit, Inc. D'Agostino Associates, Inc. Board of Selectmen <br /> Architect Contractor Owner <br /> 51 North Street 46 Farwell Street 16 Great Neck Road North <br /> Address Address Address <br /> Hingha 2043 Newton, MA 02160 Mashpee, MA 02649 <br /> By: U By By: <br /> Date: U Date, r ��1 Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.