My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/27/2008 DESIGN REVIEW COMMITTEE Minutes
>
03/27/2008 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 5:01:41 PM
Creation date
4/1/2025 3:37:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
03/27/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r. <br /> 168 Industrial Drive <br /> Free Standing, Identification Sign <br /> Representative—David Noonan,Plymouth Sign Co. <br /> David Noonan was present.' He said he attached to his application a copy of the finished product he did at <br /> Hyannis location so the Committee could see what the finished product would actually look like. Right now at <br /> Industrial Drive location they have a temporary site sign there. Mr. Noonan showed site plan to show <br /> approximately where sign will be. He said it will fall into the set-back area when landscaping done. He said <br /> the Landscape plan not yet done. <br /> Conclusion: Approved signage with condition the location to be as approved by the Planning Board in <br /> the Special Permit application. <br /> Heather-sign and awnings <br /> 20 Joy Street <br /> Representative—Paul Luszcz,Zebra Visuals <br /> Paul Luszcz appeared. The application was reviewed and the Committee said it was a great job. <br /> Conclusion: Stamped approved. <br /> Landscape Plan <br /> The landscape plan for 684 Falmouth Road site was reviewed. <br /> Conclusion: Stamped Approved. <br /> Approval of Minutes <br /> Minutes of February 7, 2008 were approved. <br /> Adjournment..:This portion of Design Review Meeting was adjourned at 9:30 a.m. so that the Committee <br /> could reconvene for a combined meeting with the Plan Review Committee. <br /> Respectfully submitted, <br /> J a Filiberti <br /> cong Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.