Laserfiche WebLink
the corrections that were made(redesigned leaching field). The revised plan has been <br /> approved by DEP and Mr. Silver has the documentation for Board review. The revisions <br /> will provide a 20-25% lesser impact to the area. <br /> Applicant has met informally with the Conservation Agent and intends to file an <br /> RDA based upon his input. The project has been put out to bid and is ready to build. Mr. <br /> Silver has also been in contact with Mr. Rowley and provided two copies of details he <br /> has requested, separation between electrical and sewerage line as shown on the profile <br /> sheet; as well as enlarging the parking area. <br /> Mr. Rowley informed the Board that he has had contact with Mr. Silver and that <br /> one minor concern had to do with the location of an alarm panel necessary for the pump <br /> chamber; as well as the location of a parking area to accommodate a maintenance truck. <br /> He also requested that detail indicate the electric line will be offset by the gravity sewer <br /> main. <br /> After brief discussion regarding minor/major modification to the Special Permit, <br /> the Chairman entertained a motion. <br /> MOTION: Dennis Balzarini made a Motion to recommend the Board consider <br /> this matter as a minor modification to the Special Permit; which motion was duly <br /> seconded by Joseph Mullin and so voted unanimously. <br /> Voting in Favor: Dennis Balzarini, Thomas O'Hara, James Leonard, and Joseph <br /> Mullen. <br /> Abstaining from the Vote: Mary Waygan (as she was not sitting on this matter <br /> when it was originally heard in August 2008). <br /> It was agreed to continue this matter to February 4, 2009 in order to afford Mr. <br /> Rowley to further review the revised plans, as well as to provide four sets of plans to the <br /> Planning Department. <br /> Approval Not Required Plans <br /> Harry Ginsburg/Sheila Robinson-BSS Design <br /> Signature of 2-Lot ANR Plan to Adjust Lot Line <br /> The Chairman called this matter to order and recognized Tom Bunker, BSS <br /> Design, representing the Applicant. <br /> References were made to a plan of land entitled, "Plan of Land in New Seabury <br /> Mashpee, MA prepared for Sheila Robinson&Harry Ginsburg, Jr.,by BSS Design, <br /> dated January 20, 2009". <br /> Mr. Bunker explained said plan would rectify a dual encroachment issue. <br /> 7 <br />