Laserfiche WebLink
16 Deans Hollow Road, Marianne M. Townsend Trustee, MMT Revocable Trust <br /> ➢ Representative: Julia Garden Design <br /> Withdrawal Request <br /> • Original proposal was for vista pruning <br /> • Issue identified with plan of record that made it unsuitable for current purposes <br /> • Applicant has contacted an engineering firm to re-evaluate <br /> • Plan to resubmit completely new application <br /> Agent <br /> • Applicant requests to withdraw the application without prejudice <br /> Motion <br /> • Ms. Thornbrugh made the motion to accept the withdrawal without prejudice, which Ms. <br /> Godfrey seconded. <br /> • Vote: Ms. Thombrugh (Yes), Ms. Godfrey (Yes), Ms. Clapprood(Yes), Mr. Sahl (Yes), <br /> Mr. Colombo (Yes) <br /> o The motion passed unanimously <br /> Documents provided: Julia Garden Design,Ltd.;Notice of intent application and project narrative; 02/12/25 <br /> Plan"Vegetation,Pruning Plan" <br /> NOI <br /> 34 Triton Way, 117710 Calla Lilly, LLC. <br /> ➢ Representative: Merrill Engineers and Land Surveyors <br /> Project Overview & Proposed Work <br /> • Property has resource areas within 100 ft <br /> • Existing single-family home dates back to 1967 <br /> • Proposal includes repairing/expanding riprap to elevation 23 (flood zone level) <br /> • Plan to hydroseed and plant American beachgrass after stabilization <br /> • Equipment would access the site from western section of Triton Way, working in sections <br /> from the water <br /> • Current riprap is lower than neighboring properties, causing waves to overtop and erode <br /> soil behind <br /> Concrete Wall Concerns & Environmental Considerations <br /> • Concrete retaining wall proposed to protect planned new house construction <br /> • Commissioner concerned about lack of stamped plans and need for peer review <br /> • Noted cesspools on property (no longer active) with current tank and leaching field <br /> • Discussion about vegetation vs. concrete for stabilization <br /> • Agent explained properties developed before August 18, 1978, are grandfathered for <br /> bank armoring <br /> • Current bank condition described as `dire' with chunks being lost even in mild weather <br /> • Agent suggests possible emergency measure to prevent further erosion during review <br /> Compromise Solution & Motion <br /> 13 <br />