Laserfiche WebLink
<br /> for mitigation requirements. Mr Cook read the abutter letter from abutter Christina Willworth. <br /> <br /> The letter raised concerns regarding construction of a new home, site disturbances, drainage, <br /> <br /> <br /> erosion, parking space, maintenance logistics and overall close proximity to abutting property <br /> <br /> lines as well current ongoing construction activities on two other properties on the same road and overall <br /> <br /> <br /> cumulative impacts thereof. Mr. Bunker acknowledged the concerns raised by the abutter and <br /> <br /> asked for a continuance and to be forwarded the abutter’s letter. Mr. Cook asked for a motion to <br /> <br /> <br /> continue the hearing to August 21rst. Mrs. Thornbrugh motioned for a continuance to Aug. 21rst. <br /> <br /> Mr. Sahl seconded the motion. No discussion. <br /> <br />st <br /> Voting on motion to continue to Aug. 21 2025 <br /> <br /> Mrs. Thornbrugh (YES) <br /> <br /> <br /> Ms. Godfrey (YES) <br /> <br /> Mr. Sahl (YES) <br /> <br /> <br /> Mr. Colombo (YES), <br /> <br /> Mr. Cook (YES) <br /> <br /> <br /> Motion passes (Unanimous 5-0) <br /> <br /> <br /> <br />43- <br />NOI 5 Deans Hollow Road, John & Beth Ann Lewis & Drolet. Proposed installation of innovative <br />3350 <br /> alternative (I/A) septic system. <br /> <br /> <br /> (Representative: Cape & Islands Engineering Inc.) <br /> <br />th <br /> Applicant requests a continuance to Sept 4, 2025. Agent Kent provided details of continuance <br /> <br /> <br /> request for this proposal and another for the same property on the agenda. He stated that the <br /> <br /> representative wished to have both projects continued to the same hearing date together. <br /> <br /> <br /> Additional conversation ensued and Agents Kent and McManus recommended not discussing <br /> <br /> the details of a project that has been requested to be continued. Mr. Cook asked for a motion. <br /> <br />th <br /> Mrs. Thornbrugh motioned for a continuance to Sept 4. Mr. Sahl seconded the motion. No <br /> <br />th <br /> discussion. Voting on motion to continue to Sept 4, 2025 <br /> <br /> <br /> Mrs. Thornbrugh (YES) <br /> <br /> Ms. Godfrey (YES) <br /> <br /> <br /> Mr. Sahl (YES) <br /> <br /> Mr. Colombo (YES), <br /> <br /> <br /> Mr. Cook (YES) <br /> <br /> Motion passes (Unanimous 5-0) <br /> <br /> <br /> <br /> <br />NOI 19 Uncle Henry’s Road, Monica Miller. Proposed addition to existing garage, remove and <br />43- <br />3351 <br /> rebuild deck, installation of innovative alternative (I/A) septic system, and mitigation plantings. <br /> <br /> (Representative: Cape & Islands Engineering Inc.). <br /> <br /> <br /> Applicant requests a continuance to August 21rst. Rationale for continuance is more time needed <br /> <br /> to finalize details. Mrs. Thornbrugh motioned for a continuance to August 21rst, 2025. Mr. Sahl <br /> <br /> <br /> seconded the motion <br /> <br />st <br /> Voting on motion to continue to Aug. 21 2025 <br /> <br /> <br /> Mrs. Thornbrugh (YES) <br /> <br /> Ms. Godfrey (YES) <br /> <br /> <br /> Mr. Sahl (YES) <br /> <br /> Mr. Colombo (YES), <br /> <br /> <br /> Mr. Cook (YES) <br /> <br />8 <br /> <br /> <br />