My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/20/2025 PLAN REVIEW COMMITTEE MINUTES Minutes
>
05/20/2025 PLAN REVIEW COMMITTEE MINUTES Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:29:24 PM
Creation date
9/11/2025 9:02:37 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLAN REVIEW COMMITTEE MINUTES
Meeting Document Type
Minutes
Meeting Date
05/20/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Minutes of Meeting <br /> Plan Review Committee <br /> Tuesday, May 20, 2025 <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Mr. Peltier said that there should be a fence around the equipment, a fire <br /> suppression system installed, and a Knox Box. <br /> Brian Tobin, Town Planner <br /> Mr. Tobin had a conversation with Town Counsel, and it was agreed that this is a <br /> modification of a ZBA Special Permit. In all fairness to the abutters, and for the <br /> administrative convenience of the applicants, NextGrid should apply for a <br /> modification to the Special Permit with the ZBA, as a public hearing, and in the <br /> same notice can include a public meeting to request waivers with the Planning Board <br /> per the by-law. It would be appropriate for the applicant to have the Planning Board <br /> waivers prior to present them to the ZBA at their public hearing. <br /> Mr. Tobin suggested that a letter listing the waivers be submitted by the applicant <br /> to the Planning Board, and then submit those recommended waivers along with the <br /> application modification to the ZBA for their public hearing. <br /> Mr. Morris said that the ZBA public hearing notice will include the accessory use to <br /> the Special Permit. A modification of an accessory use for solar. <br /> Mr. Tobin would like the Town Engineer involved in this project. <br /> Mr. Tobin asked Ms. Laurent if the concerns were addressed for the drainage. Ms. <br /> Laurent said; yes. <br /> There was discussion regarding the fee for the ZBA public hearing and was told that <br /> the fee is $250, and there is a separate fee for the abutter list and processing the <br /> mailing that will be emailed to the applicants. <br /> There will be a deposit required for the Town Engineer to be determined at the ZBA <br /> public hearing. Generally, the fee is $10,000 to cover the peer review and inspections <br /> performed by the Town Engineer. <br /> Mr. Rodney C. Collins, Town Manager <br /> No comments. <br /> There were no more comments from the Committee. <br /> Mr. Morris asked for a motion. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.