My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/13/2025 ZONING BOARD OF APPEALS Minutes
>
08/13/2025 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:28:28 PM
Creation date
9/12/2025 9:45:52 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
08/13/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> AUGUST 13, 2025 <br /> 8 Nehoiden Road: Owner, Edward J. Farley requests a Written Finding under <br /> §174-17 of the Zoning Bylaws to allow for construction of a second floor addition <br /> to the existing house, a deck to the easterly side of the existing house, add a roof <br /> over the stoop at the front of the existing house, and a detached garage with an <br /> (ADU) Accessory Dwelling Unit above on property located in an R-3 Zoning <br /> District, Map 125, Parcel 123, Mashpee, MA. <br /> Attorney Christopher Kirrane stated that this project was before the Board at the <br /> last hearing and there were two items to address. There was some confusion <br /> about the public hearing notice because it had not sufficiently described all the <br /> proposed alterations to this property; specifically the garage with the ADU. The <br /> ADU specifically isn't under the jurisdiction of the Zoning Board. However, there <br /> is a structure proposed that should be included in the Written Finding of the <br /> public hearing notice. <br /> The second issue was the storm water management. Mr. Raul Lizardi-Rivera, <br /> from Cape Islands submitted the drainage calculations. He was not present at <br /> the hearing, but could be available if needed. <br /> The project consists of some additions to the existing dwelling. The non- <br /> conformities only exist because of the flood zone. The property is 100% lot <br /> coverage, and cannot meet the 50-ft setback from wetlands. But the existing <br /> structure and the proposed structure will meet all other dimensional setbacks. <br /> The project will comply with the side yard and rear setbacks. Although there is <br /> no rear yard setback because the property fronts two roads. So the front yard <br /> setbacks comply for both the proposed structure and the existing structure. The <br /> lot coverage is 100%, but is well under the 20% building coverage which would <br /> otherwise be required in the R3 Zoning District. <br /> The Board of Health comments dated August 11, 2025 were read into the record; <br /> "Septic is designed for three bedrooms,floor plan shows three bedrooms." <br /> The Conservation Department comments dated August 12, 2025 were read into <br /> the record. "Notice of intent application was approved due to proposed location of <br /> addition and ADU altered areas and no disturbance to native vegetation will occur <br /> for construction." <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.