Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> NOVEMBER 12, 2025 <br /> Chairman Bonvie asked Mr. Morris if the project requires a raze and replace permit. <br /> Mr. Morris said no because the lot is within the New Seabury Special Permit and has no setback <br /> requirements. <br /> Mr. Furbush asked Mr. Morris will the new house be more detrimental to the neighborhood <br /> because of the increase in the size of the new house, and will it be more detrimental within the <br /> setback from the coastal bank. <br /> Mr. Reidy read the Board of Health comments dated November 10, 2025 into the record; "Septic <br /> designed for 4 bedroom, floor plans show 4 bedrooms. Gym in basement not fit for Human <br /> Habitation and cannot be used as bedroom. " <br /> Mr. Reidy read the Conservation Department comments dated November 11, 2025 into the record; <br /> "NOI application was approved with a 3:1 vote from the Commission due to currently existing <br /> unstable conditions of the coastal bank and the overall reconstruction of the entire property will <br /> benefit all resource areas. Concerns over setback of the pool from the top of bank and compelling <br /> need for a larger dwelling in the buffer zone were points of discussion. Conditions of approval <br /> are submission of a more detailed mitigation planting plan, installation of hay bales extending to <br /> the road, three year mitigation monitoring contract with a qualified professional, and pool must <br /> achieve a 25'setbackfrom top of bank. " <br /> Mr. Reidy wanted to know the points of discussion from the Commission regarding the "larger <br /> house". <br /> Attorney Wall said that the Commission reviews the performance standards that are applicable. <br /> They look at the stability of the coastal bank.The elevation of this house is 40 ft.They had concerns <br /> with stability of the bank, the depth of the pool and excavation. A condition was given that when <br /> the bank restoration is done, the pool must be a minimum of 25 ft. back from the coastal bank as <br /> part of their wetlands permit. There was a waiver required under their regulations and is a standard <br /> they review if there is a compelling need of what is proposed. The Commission approved the <br /> revetment plan and landscape plan. <br /> Attorney Wall addressed the concerns from Mr. Furbush. The house is definitely larger, but if the <br /> regular requirements were applicable, it does meet the side yard setbacks. It's currently <br /> nonconforming to the front, and is increasing that nonconformity if there was such a <br /> nonconformity. The garage is getting closer to the house and would substantially comply with lot <br /> coverage. The existing lot coverage is 7.5% and increasing to 17.2% and would meet all those <br /> requirements. The only nonconformity is the setback from wetlands at 24.3 ft., and should be 50 <br /> ft. and this setback is being maintained the same. <br /> 13 <br />