Town of Mashpee Sewer Commission <br /> t <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> Summerwood is estimated at 16,000 gallons per day <br /> Sea Oaks are estimated at 13,000 gallons per day <br /> Housing Authority is estimated at 3,000 gallons per day <br /> Total of 32,000. <br /> Wastewater Flow is Required to "Feed"the WRRF, Build a Healthy Biomass, and Start <br /> Achieving Nutrient Reduction <br /> (PowerPoint) <br /> Phase 2 <br /> Phase 2 Time to Advertise and Bid <br /> • Design is being finalized for: <br /> o Contract 1—WRRF Improvements (equipment, one tank, new Administration <br /> Building (Treatment Facility) <br /> o Contract 2 — Collection System Pump Stations (six submersible pumping stations <br /> like Phase 1) <br /> o Contract 3 — Collection System South (low pressure system in Pirate Cove's area) <br /> o Contract 4— Collection System South (gravity and low pressure) <br /> o Contract 5 — Collection System North (gravity and low pressure) <br /> o Contract 6— Collection System North (gravity and low pressure) <br /> • Other items required to obtain permission to Advertise from DEP/SRF <br /> o Easements— Currently in production —Anticipated competition within the next <br /> 30-days <br /> Chair Harris commented that the SR P Deadline is so that they are eligible for funding that will <br /> give 2S%forgiveness with 0%financing. Vice Chair Towle asked when the groundbreaking <br /> would be. Mr. Drainville answered that signed contracts need to be obtained by the end of <br /> August 31, 2025, so fall of 2025 is when the initial planning work done by the contractor would <br /> start in September 2025. <br /> o Groundwater Discharge permit Modification — Permit is in 30-day public review <br /> period ending on June 22, 2025, with the hope that the Groundwater Discharge <br /> Permit will be obtained by early July 2025. <br /> o Mass Historical; MEPA; National Heritage —Anticipated mid-June 2025 <br /> o Conservation Commission and Local Permits— received <br /> (PowerPoint) <br /> Bidding Schedule <br /> • SRF Deadline—Original deadline was June 30, 2025, for Contract Execution but SRF <br /> extended to August 30, 2025. <br /> o Groundwork District Permit did not come in in enough time, so SRF extended the <br /> deadline until August 30, 2025 <br />