Laserfiche WebLink
Capital Improvement Program Committee <br /> Meeting Minutes <br /> December 11, 2025 <br /> • Usage: Predominantly for summer camp transportation and occasional senior outings. <br /> • Quote: $56,539 (purchase), minus$14,000 trade-in=$42,539 net expense. <br /> • Funding Source: Revolving Fund. <br /> • Vendor: Colonial Ford,state contract price(municipal group—meets bidding requirements);price <br /> guarantee through December 31, 2026. <br /> 4. Presentation of Caoital Reauests-Josegg Peltier Fire and Brandon RgMsey Ltg!��Chief <br /> Request: Replace ambulance A3 <br /> • Subsequent Years: Staggered replacement of A4,A2,and Al through FY30. <br /> • Justification: Long lead times (2-3 years for new fire apparatus). Lifespan per ambulance -5-6 <br /> years; high utilization rates (30-47k miles per year; current vehicles over 120k miles). <br /> • Funding Source:Ambulance Receipts Account(annual receipts approx. $1.2-$1.3 million). <br /> • Additional Funding: TPE' collection contractor recovers extra ambulance billing revenue <br /> (-$150,000-$200,000/year). <br /> • Ambulance Billing Rates:$1200(Basic Life Support),$1800(Advanced Life Support)per run;rates <br /> compatible with Cape average. <br /> • Rationale:Aging fleet, increasing repair needs due to delayed deliveries and high mileage. <br /> Survivability and operational readiness are paramount. <br /> Request: Replacement of Deputy Chief's Vehicle <br /> • Current Vehicle: Former Chiefs For Explorer (-38,000 miles), plagued by mechanical problems <br /> and inefficient maintenance (not fully serviceable by Town mechanic due to being hybrid) <br /> • Funding Source: General Fund, planned $10,000 trade-in included in request. <br /> • Discussion:Town Manager to address mechanic certification/training for hybrid/electric fleet. <br /> Request: Base Radio Replacement—Stations 1 and 2 <br /> • Justification:Station base radios (20+ years old) no longer supported by manufacturer (CPI); <br /> maintained via staff internal 'patching'. <br /> • Operational Issue: Reduced reliability; only workaround is internal portables; redundancy <br /> inadequate for failures. <br /> • Planned Solution: Replace both base stations for enhanced reliability and potential state <br /> interoperability. <br /> • Vendor: Motorola recommended for consistency. <br /> • Discussion: Suggestion raised to consider phasing replacement(Station 1 this year,Station 2 next <br /> year)to spread costs; Fire Department to research operational impact of staggered replacement. <br /> • Funding Source:TBD,with clarification needed for free cash figure and source. <br /> 5. Presentation of Capital Requests-Jared Meader. Wastewater sy erintnent <br /> Request: Phase 3 Wastewater Treatment Plant Design with Sludge Removal <br /> Scope: <br /> • Location: Proposed north of Route 151, west of John's Pond, abutting Joint Base Cape Cod (Zero <br /> Back Road-Town parcel with deed restrictions against habitation/large gatherings). <br /> • Project: Design a new treatment facility to serve the Waquoit Bay watershed; necessity driven by <br /> absence of viable recharge/discharge site in current service area. <br />