Laserfiche WebLink
of TMs s,s <br /> z. <br /> Aannin Board <br /> c� <br /> 16 Great Neck Road North <br /> .wlashpee, Aassachusetts 02649 <br /> That continues to be the same, during that operation in the future, the flashing yellow is <br /> flashing. <br /> Mr. Milbury asked about putting in a green turn signal for the 75% of consumers going to the <br /> rotary. It would greatly benefit those people but degrade the intersection. Additional time is <br /> needed to serve just one singular movement. <br /> Ms. Faulkner noted the delay on Rt. 28, when someone is crossing the crosswalk on the right <br /> turn in, it might be unlikely, but it will cause back up on Rt. 28. <br /> The February 4th meeting will have a civil engineering and continued traffic discussion, along <br /> with the entrance alternatives for trucks. <br /> MOTION: <br /> Mr. Balzarini made a motion to continue the Public Hearing to February 4,2026 at <br /> 6:40PM. Seconded by Ms. Faulkner. All in favor. <br /> BOARD ENGINEER REPORT <br /> Ms. Christy stepped away for the moment, but they are currently working on the letter for the <br /> Shellback Way project. <br /> OLD BUSINESS <br /> LCP Review and Update- Land Use and Facilities <br /> Mr. Tobin noted the Facilities chapter was done by Mr. Hansen and he took on Land Use with <br /> his Department. He solicited feedback from Department Heads across Town. Recently, he <br /> finalized a table in the Facilities chapter that covered all town owned buildings covered by the <br /> Capital Facilities Plan. He will follow up with the DPW Director for commentary and feedback. <br /> NEW BUSINESS <br /> Vote on Topspin Cash Surety pending Subdivision Approval <br /> The estimate from Pastore Construction was for $713,000, the applicant is asking to do a <br /> performance bond in lieu of covenant. <br /> Mr. Tobin explained typically, a covenant is the first step, a recorded restriction without a dollar <br /> amount, all ways are paved, utilities are installed, then the applicant comes back before the <br /> Board for a release of covenant. If the work is incomplete, they will issue a performance bond. <br /> Here, the applicant wants to jump right into the bond stage with a dollar amount that should <br /> cover all costs. It helps the applicant when holding permits to start building. With that, the <br /> estimate has 50% added. <br /> 16 <br />