My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/14/2026 ZONING BOARD OF APPEALS Minutes (2)
>
01/14/2026 ZONING BOARD OF APPEALS Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:30:44 PM
Creation date
2/18/2026 3:48:55 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
01/14/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JANUARY 14, 2026 <br /> The plan depicted the partially impacted flood zone area, and the engineers noted the frontage is <br /> non-conforming at 100 ft. The lot fronts both Mashpee Neck Road and Captains Row which <br /> requires the proposed dwelling to meet the 40-foot setback. However, the average of the two <br /> houses on Captain's Row are 24 ft. The front yard setback to Mashpee Neck Road is non- <br /> conforming at 13.9 ft and the setback to wetlands is zero because the existing structure is basically <br /> situated on the flood zone line. <br /> Attorney Kirrane provides photos of the existing structure that is in disrepair. The new structure <br /> will be building code compliant.The lot coverage will increase from 15.3%to 24.9%. That equates <br /> to about an 814 square foot increase in coverage. But 25% is allowed because the lot is under <br /> 10,000 square ft. <br /> The setback from Mashpee Neck Road is currently 13.9 ft. and will be moved significantly further <br /> from the flood zone to 34.7 ft. towards Captains Row. The setback to the wetland is increasing <br /> approximately 14 ft. There are dry wells for storm water management being proposed where there <br /> are none now. Mark Dibb, with Cape and Islands Engineering who designed the plan indicated, <br /> "It is designed for the 25-year storm. <br /> The width of the paved driveway on Mashpee Neck Road will be reduced and will have drywells <br /> and a catch basin installed and will significantly improve the existing condition that had no storm <br /> water management. <br /> The project was approved by Conservation Commission with significant mitigation and restoration <br /> conditions. The proposed project under the zoning bylaws is consistent with the neighborhood. <br /> There are no new non-conformities being created. The proposed plan depicts sufficient parking <br /> situated from Captains Row, and from Mashpee Neck Road. The Board can consider that this <br /> project is not substantially more detrimental to the neighborhood. <br /> Generally, the Board of Health will require a new IA septic system to be installed, however, the <br /> Health Agent noted that the proposed house is scheduled to be connected to the new sewer system <br /> in the next phase. <br /> The Conservation Department comments dated January 9, 2026, were read into the record; <br /> "Resource Areas: LSCSF, buffer zone to Salt Marsh, and buffer zone to Coastal Bank. NO] <br /> application was approved with a unanimous vote from the Commission due to multiple plan <br /> revisions that ultimately moved the proposed house construction outside of the flood zone and <br /> conditioning engineered report submitted to the department once construction is complete. The <br /> Commission's overall concern was about the current septic being utilized until the sewer <br /> connection is available. The engineers report will outline if septic use prior to sewer hookup is <br /> needed any possible timeline as well for how long the existing septic will be used prior to sewer <br /> hookup. " <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.