My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/14/2026 ZONING BOARD OF APPEALS Minutes (2)
>
01/14/2026 ZONING BOARD OF APPEALS Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:30:44 PM
Creation date
2/18/2026 3:48:55 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
01/14/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JANUARY 14, 2026 <br /> 5 Deans Hollow Road: Owners, John F. Lewis and Beth Ann Drolet request a Special Permit <br /> under §174-17.1 and §174-3 3 of the Zoning Bylaws to raze and replace an existing single family <br /> residential structure with a new single family residential structure on property located in the R-3 <br /> and Popponesset Overlay District, Map 117, Parcel 70, Mashpee, MA. <br /> Attorney Christopher Kirrane represented the applicants for the raze and replace project. The <br /> requirements are 6,000 square feet of lot area, 60 ft of frontage, 25- foot front yard setback, 15 ft. <br /> side and rear setbacks, maximum lot coverage of 25% and in the case, and a 50-ft set back to <br /> wetland pursuant to Section 174-33. <br /> There are several non-conformities for this lot. The whole lot is within land subject to coastal storm <br /> flowage. For zoning purposes indicates zero square feet and means there is 100% lot coverage. <br /> The home fronts both Dean's Hollow Road and Shore Drive and is non-conforming to both of <br /> those roads. The front yard setback to Deans Hollow Road is 24.8%, and the front yard setback to <br /> Shore Drive is 19.8%. So, those are both non-conforming conditions. The structure coverage as a <br /> percentage of the lot area is currently 17.9%. The proposed percentage structure coverage of total <br /> lot area will be 23.3% which is under the 25% maximum allowed in the Popponesset Overlay <br /> District. The proposed structure will increase from 1,795 sq. ft. to 2,341 sq. ft. The front yard <br /> setback to Shore Drive will improve slightly from 19.8 ft. to 20.5 ft. The setback from Deans <br /> Hollow Road will not be improving from 24.8 ft. to 24.2 ft. which is 6 inches and suggests to the <br /> Board can be considered di minims. <br /> The proposed new dwelling will be flood zone compliant and building code compliant. A new IA <br /> Septic System is proposed and will have drywells and includes storm water management. This <br /> project was approved by the Conservation Commission with conditions over 1,900 sq. ft. of <br /> mitigation. There's no increase in bedrooms and it is consistent with the redevelopment on Deans <br /> Hollow Road. <br /> The three elements for this proposal are no new non-conformities being created, there will be <br /> sufficient parking located on Deans Hollow Road and Shore Drive, and the proposed new dwelling <br /> is not substantially more detrimental to the neighborhood. <br /> Mr. Reidy read the Board of Health and Conservation Department comments into the record. <br /> The Board of Health comments dated January 12, 2026, were read into the record; "House to have <br /> 4 bedrooms, septic is designed for 4 bedrooms. 29,980 Sq. Ft. of property from Lot 65 (79-97-0) <br /> has been deeded to this property to allow for 4 bedrooms in the Zone IT " <br /> The Conservation Department comments dated January 9, 2026, were read into the record: <br /> "Resource Area: LSCSF. NOI application was approved with a unanimous vote due to <br /> improvements onsite with a flood compliant foundation, IA septic upgrade, extensive mitigation <br /> planting plan, and nitrogen credits for increase in septic flow. Application was approved with the <br /> following conditions of three year mitigation and monitoring contract with a certified professional <br /> and gravel placed under structure. " <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.