My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/09/2026 SELECT BOARD Minutes (2)
>
03/09/2026 SELECT BOARD Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 10:46:18 AM
Creation date
5/4/2026 10:45:51 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
03/09/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Select Board <br />March 9,2026 <br />Minutes <br /> <br />reasons. The project has been included in the Capital Improvement Plan since FY24, <br />though its scope has increased. <br />Article 25 – Senior Center HVAC Replacement <br />A request for $500,000 to replace the approximately 20-year-old HVAC system at the Senior <br />Center. The current system results in uneven temperatures throughout the building. <br />Discussion included potential e?iciencies, contractor considerations, and opportunities <br />for rebates or incentives through programs such as Cape Light Compact and National Grid. <br />Article 4 – Wastewater Phase 3 <br />Jared Meader, Wastewater Superintendent, presented a request for $12 million to fund <br />Phase 3 of the wastewater project, which is proposed to be expanded to maximize capacity <br />in the Waquoit area. The treatment facility would be located on a portion of town-owned <br />land and function as a water resource recovery facility. Concerns were raised regarding <br />overall cost, future funding needs and potential legal challenges; the Town Manager <br />confirmed no known legal issues at this time. <br />Article 5 – Route 151 Wastewater Infrastructure <br />This article proposes installing wastewater piping under Route 151 to allow for future <br />system connections. Discussion included whether this work could have been completed <br />during prior road construction, with the Town Manager noting past discussions and <br />di?ering guidance at that time. <br />Article 6 – Wastewater Department Position <br />A proposal to create a new full-time position to support the operational and financial <br />demands of the wastewater system. The Town Manager emphasized the role is critical to <br />protecting the town’s investment and achieving a self-sustaining system within five years. <br /> <br /> <br />8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.