My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/05/2025 PLANNING BOARD Minutes (2)
>
11/05/2025 PLANNING BOARD Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2026 5:04:02 PM
Creation date
5/19/2026 9:29:18 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
11/05/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
of TMs s,s <br /> z. <br /> AU1MLIUV�y <br /> own qf MaS 2 Panning Board <br /> c� <br /> 16 Great Weck, RoadWorth <br /> -Mashpee, -Massachusetts 02649 <br /> now. These illustrations will be added to the traffic presentation. She would also like to show <br /> the mitigations to traffic. <br /> Mr. Bogosian added that within the Commission's process, you work with specific divisions on <br /> the inside that ensure guidelines are being met. They are always coming back with a different <br /> approach or angle. <br /> Ms. Faulkner emphasized the intersection of the bottle neck and the developer wants to <br /> discuss how the delay is mitigated. There is a delay demonstrating where cars line up, it only <br /> has to change a matter of seconds, with how the lights are triggered. Outside of the site, a <br /> project like this requires the applicant to pay for a lot of off-site work. <br /> Mr. Oakley would like him to touch on the off-site traffic improvements, and how the right in <br /> and right out remains a safe egress. <br /> Mr. Bogosian answered that the point of entry turns dramatically right, almost like an on ramp <br /> to a highway, but it will feel very natural based on the design. The bike path is maintained, and <br /> the pedestrian walk symbol, are all items that ensure people will turn right in and out safely. <br /> Mr. Hansen looked at the plans and the stormwater looked okay. Traffic and safety are of the <br /> utmost importance here, between the time delays, wait times, traffic frustration for abutters, <br /> and people using Rt. 28 at peak times. In reviewing the study, it looked adequate. There is a <br /> lot of new activity going on there, he asked the developer to comment on what they have done <br /> to collaborate with neighboring properties for overflow parking. <br /> Mr. Bogosian commented there were conversations with abutting commercial properties and <br /> the bank, but they are required to have 89 spots and they have 138. Based on those <br /> conversations, they wanted to make sure they had way more than what was needed. The <br /> Hyannis building was existing. They want sites with traffic flow and space; Trader Joes is <br /> desirable because they do things properly. They wanted a site conducive for this business. <br /> They also know the demand is in Mashpee. <br /> Ms. Waygan noted this site would have its completely own entrance. She noted the vegetative <br /> swales that were discussed, but she would like other examples of LID (Low Impact <br /> Development) being used on site. <br /> Mr. Dibb stated every square inch of roof runoff and pavement is accounted for. There is a <br /> vegetative treatment with TSS removal for nitrogen and phosphorous per the town's <br /> requirement, permeable asphalt, and the roof runoff will flow into the vegetative swale first. The <br /> entire site has great separation to groundwater, test holes dug 15ft. and never hit groundwater. <br /> At elevation 38, ground water is relatively close to 0, the 20ft. separation allows sand to filter, <br /> then the nitrogen reducing IA system. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.