Laserfiche WebLink
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> nitrogen loading calculations,with explanation that one set of calculations reflected existing site conditions and another <br /> reflected proposed conditions incorporating the nitrogen-reducing septic system. <br /> Significant discussion then focused on unauthorized alterations previously conducted on the coastal bank. It was stated <br /> that lawn areas, ornamental plantings, landscaping, and other site improvements had been installed on the coastal bank <br /> without approvals from the Commission or the New Seabury Architectural Oversight Committee. It was further stated <br /> that vegetation had been removed from the bank and replaced with lawn and ornamental species, substantially altering <br /> the natural bank conditions. Discussion occurred regarding the need for restoration of the coastal bank and whether <br /> enforcement action should be initiated in connection with the unauthorized work. <br /> Concerns were also raised regarding compliance with Regulation 16 governing alterations within 75 feet of a coastal <br /> bank. It was stated that the proposed patio,porch modifications,new footings, and potential retaining structures near the <br /> top of the coastal bank may not comply with the regulation. Questions were raised regarding whether rebuilding <br /> portions of the existing deck could qualify as maintenance of an existing structure versus construction of expanded <br /> structures and new footings within the protected area. It was further stated that additional structural information and <br /> house plans would be necessary to fully evaluate the proposal. <br /> Discussion also addressed whether restoration of the unauthorized coastal bank alterations could be incorporated into <br /> the pending NOI review or whether a separate enforcement order should be issued. It was stated that restoration of the <br /> altered coastal bank would still need to occur independently through enforcement action, although restoration details <br /> could potentially be coordinated alongside the pending application review. <br /> Following discussion,the applicant requested a continuance to June 11, 2026,in order to prepare revised plans and <br /> address the Commission's concerns regarding coastal bank impacts, restoration requirements, and structural details <br /> associated with the proposed improvements. <br /> MOTION: To continue 14 Littleneck Lane to June 11, 2026. <br /> Motion by: Sandi Godfrey Seconded by: Paul Colombo <br /> Vote: Motion passed unanimously by roll call vote. <br /> Steve Cook,Paul Colombo, Sandi Godfrey, Seana Pitt <br /> NOI 63 Monahansett Road, Steven H. &Andrea B.Dubbs.Proposed project for an addition to an <br /> existing single-family home along with a patio area,utility shed,mitigation plantings, and associated <br /> site work. (Representative: Merrill Engineers and Land Surveyors) 43- <br /> 3418 <br /> The Commission reviewed a Notice of Intent for 63 Monahansett Road regarding a proposed addition to an existing <br /> single-family home,patio area,utility shed,mitigation plantings, and associated site work,represented by Merrill <br /> Engineers and Land Surveyors. The applicant's representative stated that the property currently contains an existing <br /> single-family dwelling, deck, gravel driveway,lawn, and landscaped areas,with bordering vegetated wetland, coastal <br /> bank, and Land Subject to Coastal Storm Flowage located on or within 100 feet of the property. The proposal included <br /> interior renovations,removal of the existing rear deck, construction of a pile-supported addition, installation of a 9-by- <br /> 12-foot shed, construction of an impervious paver patio at grade, and approximately 2,300 square feet of mitigation <br /> plantings. It was further stated that invasive vegetation including burning bush, Japanese holly,bittersweet,greenbrier, <br /> and grapevine would be removed and replaced with native shrubs and grasses. <br /> Discussion focused extensively on coastal bank delineation and construction impacts within the coastal bank buffer <br /> area. Questions were raised regarding the absence of coastal bank cross-sections,transects, and documentation <br /> supporting the delineation methodology required under DEP guidance. Additional concerns were raised regarding bank <br /> stability, construction methodology, and whether engineering details demonstrating protection of the coastal bank <br /> during construction had been provided. The applicant's representative acknowledged that additional information and <br /> stamped engineering details could be submitted for further review. <br /> 13 <br />