My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/01/2026 SELECT BOARD Minutes (2)
>
06/01/2026 SELECT BOARD Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2026 12:00:39 PM
Creation date
6/25/2026 11:59:06 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
06/01/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Select Board <br />Minutes <br />June 1,2026 <br /> <br />Brian Tobin, Town Planner, provided an update on the Local Comprehensive Plan. Tobin <br />reported that the Planning Board and Planning Department have been actively working on <br />the plan since November, conducting a detailed review and revision process. He stated <br />that the Planning Board has reviewed the proposed redline changes and is working toward <br />final approval this fall. Tobin expressed optimism that the plan will be ready for <br />consideration at Town Meeting and noted that the warrant article submission deadline is <br />July 13. <br />Catherine Laurent, DPW Director: <br /> Mashpee Stormwater Program Update <br />The Select Board received an update on the Town's Stormwater Management Program <br />from Gabrielle Belfit of Tighe & Bond and DPW Director Catherine Laurent. <br /> Belfit provided an overview of the federally mandated MS4 stormwater permit program <br />and reported that the Town remains in compliance with all permit requirements. She <br />explained that the program focuses on reducing stormwater pollution, tracking nutrient <br />reductions, implementing public education initiatives, and improving water quality in <br />impaired waterways throughout Mashpee. <br /> Several ongoing stormwater retrofit projects were highlighted, including improvements at <br />the Mashpee-Wakeby State Boat Ramp, Santuit Pond Town Landing, and Attaquin Park. <br />The projects include measures such as stormwater treatment systems, bioretention areas, <br />permeable surfaces, and other infrastructure designed to reduce nutrient loading and <br />improve water quality. <br />Laurent noted that the Santuit Pond project is nearing completion, the Mashpee-Wakeby <br />boat ramp is expected to reopen shortly, and permitting for the Attaquin Park project is <br />anticipated this summer, with construction expected after Labor Day. <br />Board members discussed project costs, maintenance requirements, and future <br />stormwater priorities. Laurent stated that the Town has successfully secured grant funding <br />for many of the projects and will continue identifying additional opportunities for <br />stormwater improvements, particularly in areas with impaired waterways. Questions were <br />raised regarding roadway runoff monitoring and long-term maintenance of stormwater <br />infrastructure. Laurent explained that stormwater management considerations are <br />incorporated into roadway projects and that the Town maintains ongoing maintenance and <br />management plans with support from Tighe & Bond. <br />7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.