Laserfiche WebLink
<br />MWLMC <br />April 28,2026 <br /> <br />expertise or safety support. Participants noted that the town now has greater focus, <br />resources, and expertise related to water quality and environmental management, and that <br />several organizations already monitor conditions around the pond and restoration areas. <br />The group discussed drafting a formal request asking the town to take over responsibility <br />for lake level management after first speaking with relevant town o?icials and <br />environmental sta?. <br />Mashpee River Fishway Dam update <br />A well-attended public meeting with approximately 25–30 residents, including many <br />members of the Tribe and neighbors from around the lake area, focused on the proposed <br />Mashpee River restoration project from Mashpee Pond and Mill Pond down to Popponesset <br />Bay. <br /> Representatives from numerous organizations participated, including NOAA, the <br />Department of Conservation, APCC, DPW, river and fish passage groups, and <br />environmental science organizations. <br />Presentations explained the current proposal to remove the existing fish ladder and create <br />a more natural herring run channel extending from the lake through Mill Pond to the bay. <br /> Concerns were raised that Mill Pond currently causes herring to spread into shallow dead- <br />end areas where predators gather, while warmer water temperatures also negatively a?ect <br />their habitat. <br /> Engineers explained that the aging fish ladder and culvert require significant maintenance <br />and that future phases would narrow the channel to improve water flow for fish migration. <br />Strong concern was expressed by many attendees, particularly Tribal members, about the <br />possible loss of Mill Pond, which holds important historical and cultural significance and <br />was remembered as a longtime fishing area. <br /> Questions were also raised about whether repairing the fish ladder had been fully <br />considered instead of complete removal. It was clarified that the lake water level itself is <br />controlled primarily by the dam boards, which would remain in place. Current project <br />timelines estimate construction beginning in fall 2028 with completion targeted for spring <br />2029. <br />Mashpee & Wakeby Stormwater Restoration Project <br />A discussion was held regarding concerns at the boat ramp and surrounding lake property. <br />It was reported that the DPW Director (Catherine Laurent) stated there are currently no <br />plans to address the issue because it is considered a state matter and outside the scope of <br />the stormwater project, which is focused primarily on the parking lot. Reference was made <br />to detailed plans available through the APCC website. It was also noted that several islands <br />in the lake, once privately owned and later roped o?, were eventually transferred to the <br />Native Land Conservancy Trust. While the town owns the land near the boat ramp and may <br />2 <br /> <br /> <br />