Laserfiche WebLink
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> • Herring Warden <br /> Staff provided an update on the annual herring outmigration. It was reported that herring fry and juvenile fish <br /> are actively migrating from the Mashpee River, Santuit River, and Johns Pond. <br /> Due to ongoing drought conditions and declining water levels at Johns Pond, the Division of Marine Fisheries <br /> (DMF) authorized the temporary installation of boards to retain water while allowing continued fish passage. <br /> Staff reported that water levels are being monitored regularly to balance habitat needs with the outmigration. <br /> It was also reported that several fallen trees were observed near the Mashpee fish ladder. With the exception <br /> of one tree removed by the Department of Public Works after it obstructed water flow, the remaining trees <br /> have not impeded fish passage and may provide additional protection from predators. <br /> It was explained that the southern outlet from Johns Pond to the Childs River is currently inactive. It was also <br /> reported that a proposed Community Preservation Committee (CPC)-funded hydrology assessment of Johns <br /> Pond and Mill Pond is under consideration. If approved, the multi-year study would evaluate hydrologic <br /> conditions affecting the ponds and the Childs River and would include PFAS testing. <br /> • Harbor Management Committee <br /> No update was provided. <br /> • Mashpee River Restoration <br /> An update was provided on the Mashpee River Restoration Project. Recent public interest has focused on the <br /> proposed restoration of the Mashpee River Fish Ladder and the potential effects on Mill Pond. Under the <br /> original restoration concept, the river would be returned to a naturally flowing condition, eliminating the <br /> existing impoundment and resulting in the loss of Mill Pond as it currently exists. <br /> In response to public concerns, Tighe & Bond has been directed to prepare two fully engineered restoration <br /> alternatives for consideration. One alternative would restore the river to a free-flowing system without Mill <br /> Pond, while the second would retain Mill Pond through engineered water-control measures while still meeting <br /> the project's ecological restoration goals. <br /> Funding has been secured for the permitting phase of the project, and preparation of the engineered <br /> alternatives is underway. Once completed, both alternatives will be evaluated by the project team and <br /> presented for public review before a preferred alternative is selected and advanced through the permitting <br /> process. It was noted that no final decision has been made regarding the preferred restoration approach. <br /> 9 <br />