Laserfiche WebLink
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> documenting qualifying grandfathered docks could remain permissible. Staff recommended limiting repairs to <br /> an existing dock footprint, including storm-damage repairs, while prohibiting expansions. <br /> Members emphasized that the concept was intended as a temporary measure to allow the Commission time to <br /> review and update its dock regulations rather than create a permanent prohibition on new docks. Staff noted <br /> that some residents had expressed concern that the proposal would result in an indefinite ban and reiterated <br /> that this had never been the Commission's intent. <br /> Staff also provided an update regarding several storm-damaged docks observed during a recent site visit. Two <br /> property owners had received fines, and staff was awaiting a response from another property owner regarding <br /> whether the damaged dock would be removed or repaired. <br /> The Chair suggested that additional research be completed before the Commission's next quarterly meeting on <br /> November 5, 2026, including information regarding existing docks, waterfront properties potentially eligible <br /> for future docks, and environmentally sensitive water bodies. Staff offered to assist with compiling the <br /> information. <br /> No action was taken. <br /> Updates: (*IS minutes) (Public Comment solicited for each update—3 minutes per comment) <br /> • Red Brook Road Culvert(Waquoit Bay Research Reserve—grant assistance) <br /> Staff provided an update on the proposed Red Brook Road Culvert replacement project. It was reported that <br /> the design is being revised after property ownership and easement issues were identified,primarily on the <br /> Falmouth side of the project. Once the revised plans are complete, the project will return to the Commission <br /> for permitting. <br /> Staff explained that the project will replace the deteriorated culvert at the Mashpee—Falmouth town line to <br /> improve stormwater management and restore fish passage. Coordination with the Town of Falmouth, the <br /> Association to Preserve Cape Cod (APCC), and other agencies is ongoing. It was noted that construction will <br /> be subject to seasonal environmental restrictions and will require temporary road closures and detours. <br /> Residents will be notified before construction begins. <br /> Staff reported that funding has been secured for the pennitting phase and that nearly all construction funding <br /> has also been obtained. The broader restoration effort includes upstream habitat improvements; however, <br /> property ownership issues, unauthorized dams, and the need for temporary construction easements continue to <br /> present challenges. The current focus is on completing the culvert replacement while evaluating the feasibility <br /> of the larger restoration project. Staff stated that the duration of any road closures cannot be detennined until <br /> permitting is complete and the construction schedule is finalized. Staff also noted that the project will return to <br /> the Commission for a public hearing as part of the permitting process, at which time residents will have an <br /> opportunity to provide comments. <br /> 7 <br />