Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> AUGUST 12, 2026 <br /> A memo dated April 29, 2026, was provided by Mashpee Commons that depicts <br /> the wastewater capacity that is currently servicing the Fire Station, Police <br /> Station, Senior Center, Library, and Assisted Living Facility as 89,344 gallons, <br /> which leaves an excess/deficiency of 90,657 gallons per day, and could include <br /> three schools for 25,195 gallons per day. The Town will use 65,000 gallons and <br /> will then leave an excess of 14,300 gallons per day to service this project. They <br /> plan to tie into the water from Jobs-Fishing. The soil testing has not been <br /> performed yet because of the Tree Bylaw. He wanted to bypass the tree bylaw, <br /> but it will be difficult to perform. He provided the test results for the soil elevation <br /> that included some information on the storm water report. <br /> Mr. Buckley mentioned he reviewed the peer review questions regarding the <br /> parcel unloading for certain carriers would be an operational issue. He believes <br /> that the building manager would be responsible for that type of activity. The <br /> trash is located inside the building and that could change based on the <br /> modifications. But the building manager can bring the trash out to the curb line. <br /> There is no dedicated area for loading or unloading trash. The erosion and <br /> operations and maintenance plan are still being documented from the comments <br /> received from Allen 8, Major. They have not decided on a contractor and will <br /> require them to review the plans and phasing of the project. The traffic plan will <br /> be worked out with Mass DOT when the building plans are in the final stages. <br /> Mr. Buckley mentioned that there will be a wetlands scientist reviewing the <br /> wetlands culvert that was discovered by the Conservation Agent to determine if <br /> there is any impact on the project. <br /> Ms. Sangeleer will be conditioning a playground area on the site to accommodate <br /> up to four children. She also mentioned that the operational issue needs to be <br /> revised and will wait for the wetlands update. <br /> Mr. Furbush wanted an update regarding the Mashpee Commons wastewater <br /> capacity will include the current build-out that is happening in Mashpee <br /> Commons. Mr. Buckley will confirm the capacity once he receives additional <br /> information. <br /> Lynne Sweet let the Board know that the applicant is working to get the answers <br /> to the wastewater issue. There is other issue that needs to be addressed such as <br /> the trash location and should not be a statement that the management will <br /> handle. Also, the outdoor space is important, but a swing set is a huge liability <br /> for a management company. The question should address what amenities are <br /> located nearby that can provide an outdoor play area. The Board should realize <br /> that the process is moving in the right direction. The information is arriving as <br /> it should. <br /> 10 <br />